| A full variety of ranges and accessories available | |
|---|---|
| 1. Item: | Gravity Flow Roller Shelving System |
| 2. Style: | Quick access, Adjustable |
| 3. Material: | Grade Q235 (or SS400) Q345 |
| 4. Certification: | CE/ISO9001 |
| 5. Standard Color: | Blue(RAL5017), Orange(RAL2004), Green(RAL6000), Light Grey (RAL7035), Yellow(RAL1037) |
| 6. Adjustable Pitch: | 50mm, 50.80mm, 75mm, 76.20mm |
| 7. Access Style: | High accessibility & selectivity |
| 8. Finishing: | Powder Coated or Galvanized |
| 9. Application Environment: | Normal Temperature or Freezer |
| 10. Design Service: | CAD service available |
| 11. Back-up Service: | Installation Drawing/On Site Instruction |
| 12. MOQ: | 1 unit |
| 13. Lead time: | 3 weeks for 2*40' container |
| 14. Standard package: | Palletized, Export-Purpose Packaging |
| 15. Container Load: | 10-15tons/1*20' container, 20-25tons/1*40' container |
| 16. Trade Term: | EXW/FOB/CNF/CIF |
Q How does the Gravity Flow Roller Shelving System operate?
It uses inclined roller tracks set at a calculated slope. Pallets or cartons loaded from the high end glide downward automatically to the low picking end via gravity, supporting a First-In, First-Out (FIFO) inventory workflow.
Q What materials and standards are used in manufacturing?
The system is constructed with high-grade carbon steel Q235 (equivalent to SS400) or Q345. It fully complies with international CE and ISO9001 standards to guarantee long-term stability and load-bearing performance.
Q Are the roller shelves adjustable?
Yes. The pitch levels of the beams and tracks are adjustable, featuring standard pitches of 50mm, 50.80mm, 75mm, or 76.20mm, allowing you to customize the shelving configuration based on your goods.
Q Can this shelving system be used in freezers and cold storage?
Absolutely. The shelving frames and roller tracks are available with hot-dip galvanized or high-durability powder-coated finishes, making them perfectly suited for both normal temperatures and freezer environments.
Q Do you provide custom design and CAD planning?
Yes, we offer professional CAD layout design services to fit your specific warehouse metrics. Additionally, we provide comprehensive installation drawings and on-site setup instructions to guide the implementation.
Q What is the standard order lead time and package style?
The standard manufacturing lead time is approximately 3 weeks for a typical 2*40' container order. All parts are packed securely using standard export-purpose palletized wrapping to avoid transport damage.