Jracking Customized Warehouse Storage Racks Rust-Resistant Light Duty Cantilever Rack for Plastic Pipes Storage

Product Description

Cantilever Racking Preview
Cantilever Racking Showcase

Product Specifications

Name Cantilever Racking Material Q235B Steel
Size Customized Size Color Customized Color
Depth Customized Weight Capacity 1000kg/arm
Width Customized Height Customized
Finish Powder coating; Hot Dip Galvanized
Packing Export Package
Certification RMI/CE/ISO/TUV/AS4084-2012
MOQ One 20ft/40ft Container
Free Sample Available (Delivery Cost on Buyer)
OEM Available
Product Detail View 1 Product Detail View 2 Product Detail View 3
Structural Layout Drawing

Installation Instructions

Installation Step 1
Step 1

Connect 1 row of MK bracing brackets at the inside of columns positioned at ends, meanwhile connect 2 rows of brackets at both sides of columns in intermediate, as shown.

Installation Step 2
Step 2

Position the column (1) vertically into the fixing MK base, as shown. Connect the column and the base with M20x40 bolts (7). Fasten the other M20x40 bolts (7) on the base. Recommended torque: 86~103N.M

Installation Step 3
Step 3

The standard composition of the vertical bracing, after it has been fastened to the columns, is as shown in the illustration.

Installation Step 4
Step 4

The bases must be leveled with metal leveling plates if necessary. Then, fully tighten the M20x40 bolts(7) on the base front as indicated in step 2. Using the drill-holes in the bases for fastening them to the floor, use a 14mm bit and drill a hole with a minimum depth of 100 mm. Remove the drilling remains and carefully hammer in the fastening M10x160 anchors(11). Firmly bolt the fastening plate in place. Recommended torque: 50 NM

Installation Step 5
Step 5

The arm (12) is fastened to the column (1) using safety pins 29x140 (13). Fit the arms according to the heights and distribution shown on the corresponding project drawing, where applicable.

Installation Step 6
Step 6

Finally, the completed structure should look like the illustration.

Structure Detail A Structure Detail B
Factory Product Line
Production Process 1 Production Process 2 Production Process 3
Warehouse Overview Product Categorization Overview

Frequently Asked Questions

What are your trading terms?

1) Payment terms: T/T 30% deposit after order confirmed, 70% balance paid against bill of lading. L/C and O/A are also available.
2) Lead time: Normally in 20-25 days after deposit received.
3) Sample policy: Samples are always available for each model and can be ready in 7-15 days once payment is received.
4) Shipping port: Shanghai / Nanjing China.
5) Discounts: We offer competitive discounts for large quantity orders.

How can I receive delivery of my goods?

1) Sea freight: We will update ocean freight estimates once you confirm your designated destination sea port.
2) Client-designated agent: Provide us with the contact details of your shipping agent, and we will coordinate and arrange the delivery process.

What customer support and services do you provide?

1) Inquiries related to our products or pricing will be replied to within 12 hours.
2) Highly-trained and experienced staff will answer all inquiries in fluent English.
3) OEM & ODM customization options to help design bespoke racking solutions.
4) Experienced professional engineers to deliver optimized layout and storage solutions.

What is the ordering process for your product?

Design drawing approval → Confirm drawing → Quotation → Proforma Invoice (PI) → Confirm PI → Arrange 30% deposit → Manufacture → Quality Control (QC) inspection → Pay balance → Shipping.

What advantages do you offer?

1) Payment flexibility: We can support O/A payment terms of 40-60 days.
2) Speed: Expedited shipping options available for rush orders.
3) Price: Factory-direct competitive sales pricing.
4) Warranty: Two years warranty coverage, with replacement parts dispatched directly to you.

Do you have a MOQ (minimum order quantity) limitation?

No strict MOQ limit exists, but larger volumes yield better pricing. We recommend an order size of at least one 20ft container (approximately 15 tons) to optimize shipping efficiency and value.

How do you handle tooling fees for new custom molds?

For custom specifications requiring new production tooling, the cost of opening the mold is charged prior to the first order. This fee is partially or fully refunded once orders reach a designated volume threshold.

Related Products